STUDY OF GAS WELLS AT TITAS GAS FIELD TO IDENTIFY SICK WELLS AND RECOMMEND & SUPERVISE REMEDIAL WORKS

PROJECT DESCRIPTION

In 2006 surface seepages of gas into the atmosphere were detected in the vicinity of the TITAS Gas Field. Over a period of time the number of seepages increased along with the growing concern of the local population.

During the course of the investigation it was determined that TITAS Well No. 3, 9 and 10 were the most likely sources of the gas seepages. Further investigations discovered pressure in each casing annuli on TITAS Well No. 3. Discussions, investigations and plans were made to determine the best method to remedy the situation. The end result of these meetings was the determination that TITAS Well No. 3 was the most likely source of the surface seepages

After an International Bidding Process a contract   was awarded to Boots and Coots International. Pegasus was awarded a contract to provide a highly qualified and experienced Well Control Specialist to act as supervising Consultant to BGFCL.


SCOPE OF WORK

Under International Competitive Bidding, and Pegasus International along with Agmor Consortium were awarded the Contract for the Consultancy Services. 

Following were the Scopes of Services:-

·         To study gas wells at Titas Gas Field to identify sick wells.

·         To recommend remedial works for seepage control of Titas Gas Field. 

·         To supervise snubbing operation of Titas well no-3 and act as supervising Consultant to  BGFCL.

·         Review the existing well files and logs to document the well history.

Prepare a Report on the study of gas field and to document the meetings, procedures, observations, activities, lessons learned and a forward plan gained from the operations performed in the killing and permanent abandonment of Titas Well No-3.